Preparing a structured optical beam for human observation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11564562
APP PUB NO 20200253469A1
SERIAL NO

16790336

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a general aspect, a structured optical beam with position-dependent polarizations is prepared for human observation. In some examples, an optics method includes processing an optical beam to produce a structured optical beam for human observation. Processing the optical beam includes receiving the optical beam from a laser source; attenuating the optical beam to an exposure irradiance level that is safe for direct viewing by a human eye; expanding the optical beam to a size configured for a field of view of the human eye; and preparing the optical beam with a position-dependent polarization profile. The structured optical beam, which has the position-dependent polarization profile, is directed towards an observation region for human observation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
QUANTUM VALLEY INVESTMENT FUND LPWATERLOO ON N2L 0A9

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cory, David G Branchton, CA 42 370
Kapahi, Connor Waterloo, CA 2 1
Pushin, Dmitry A Toronto, CA 5 6
Sarenac, Dusan Waterloo, CA 5 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 31, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 31, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 31, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00