Exercise apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11559717
APP PUB NO 20210154516A1
SERIAL NO

17102520

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An exercise apparatus is provided. The exercise apparatus includes first and second base assemblies, each having a plurality of riser segments. A first rail is connected to and spans the first and second base assemblies. The first rail has a plurality of horizontal segments interspersed with a plurality of vertical segments. A second rail is spaced apart from the first rail and is connected to and spans the first and second base assemblies. The second rail has a plurality of horizontal segments interspersed with a plurality of vertical segments. The horizontal and vertical segments of the second rail correspond to the horizontal and vertical segments of the first rail. Adjacent horizontal segments of each of the first and second rails are vertically spaced apart.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Breitowich, Lee LaPorte, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 24, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 24, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 24, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00