Storage box power supply structure for saddled vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11554826
APP PUB NO 20200339208A1
SERIAL NO

16763562

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A storage box power supply structure for a saddled vehicle includes a storage box (30), a carrier (50) configured to detachably mount the storage box (30) on a vehicle body, a hook (33) configured to connect the storage box (30) to the carrier (50), a hook receiving section (53) configured to receive the hook (33), a hook-side terminal (70) provided inside the hook (33) and configured to supply electric power to an electrical component (46), and a receiving-side terminal (80) provided in the hook receiving section (53) and connected to the hook-side terminal (70) when the storage box (30) is mounted on the carrier (50).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HONDA MOTOR CO LTDTOKYO JAPAN TOKYO METROPOLIS

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Asakawa, Eijiro Wako, JP 2 0
Horii, Yoshiyuki Wako, JP 51 410
Inose, Koji Wako, JP 21 49

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 17, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 17, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 17, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00