Hybrid vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11554769
APP PUB NO 20200317186A1
SERIAL NO

16828278

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vehicle includes an engine, a first MG, a planetary gear mechanism, a battery that stores power generated by the first MG and supplies the stored power to the first MG, and an HV-ECU that controls the engine and the first MG. The engine includes a turbo. A boost line is determined on a map representing a relationship between the rotation speed of the engine and torque generated by the engine, and the turbo boosts suctioned air when torque generated by the engine, as indicated by an operating point on the map, exceeds the boost line. The HV-ECU controls the engine and the first MG so that when the allowable value Wout of power output from the battery is small, the operating point exceeds the boost line at a higher rotation speed than when the allowable value Wout is large.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHATOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ando, Daigo Nagoya, JP 72 508
Asami, Yoshikazu Gotenba, JP 46 95
Itagaki, Kenji Shizuoka-ken, JP 72 399
Maeda, Osamu Toyota, JP 137 961
Muta, Koichiro Okazaki, JP 71 487
Oyama, Shunsuke Nagakute, JP 41 175
Yonezawa, Koichi Toyota, JP 47 288
Yoshizaki, Satoshi Gotenba, JP 61 170

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 17, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 17, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 17, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00