Method of preparing hierarchical porous channel molecular sieve membrane and application thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11554348
APP PUB NO 20190262779A1
SERIAL NO

16348819

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a method for preparing a hierarchical porous zeolite membrane and an application thereof, comprising the following steps: a mesoporous structure-directing agent is added to limit the growth of zeolite crystals, and self-assembled in the crystallization process to generate a mesoporous structure. Based on a seed crystal induced secondary nucleation mechanism, this method can realize one-step hydrothermal synthesis of hierarchical porous zeolite membrane with the advantages of mild and controllable synthesis conditions, simple process, good repeatability, reduced energy consumption and cost savings. The hierarchical porous zeolite membrane prepared by the method has good cut-off performance, and the cut-off molecular weight is adjustable between 200 to 500,000 Da.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NANJING UNIVERSITY OF TECHNOLOGYNANJING JIANGSU 210009

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gu, Xuehong Nanjing, CN 5 9
Peng, Li Nanjing, CN 53 286
Yao, Xun Nanjing, CN 14 32

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 17, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 17, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 17, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00