Arrangement and method for autoalignment of a stabilized subsystem

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11549785
APP PUB NO 20200124382A1
SERIAL NO

16623813

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a director mount arrangement for automatic alignment of a subsystem relative to a platform, wherein said director mount arrangement is arranged to pivotably support the subsystem. The director mount arrangement comprises a pivot frame arrangement and a control system. The control system comprises a control unit arranged to generate control signals so as to control the orientation of and stabilize the subsystem. The control signals are generated based on angular rate of subsystem and orientation operating commands provided from an operator. The control unit further generates estimated control signals based on platform orientation information and determine a difference between the control signals and the estimated control signals, wherein the difference is indicative of mechanical misalignments between the subsystem and the platform. The control unit further generates alignment corrections based on the determined difference so as to automatically align the subsystem relative to the platform.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAAB AB581 88 LINKÖPING

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Söderström, Fredrik Järfälla, SE 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 10, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 10, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 10, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00