Facility, method for storing and liquefying a liquefied gas and associated transport vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11549646
APP PUB NO 20190257475A1
SERIAL NO

16330975

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention primarily concerns a facility for storing and cooling a liquefied gas, for example a liquefied natural gas, the facility comprising at least one tank configured to contain the liquefied gas, a closed cooling circuit configured to be supplied with liquefied gas in the liquid state coming from the tank, at least one injection member configured for reinjecting cooled liquefied gas into the tank, the facility being characterized in that it comprises at least one connection line configured to recover a cooled gas from at least one remote container that is separate and independent from the facility.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
L'AIR LIQUIDE SOCIETE ANONYME POUR L'ETUDE ET L'EXPLOITATION DES PROCEDES GEORGES CLAUDE75 QUAI D'ORSAY PARIS 75007

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bernhardt, Jean-Marc La Buisse, FR 29 24
Durand, Fabien Voreppe, FR 46 33
Gondrand, Cecile Grenoble, FR 7 1
Grabie, Veronique Coublevie, FR 10 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 10, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 10, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 10, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00