Hydrostatic transaxle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11547051
APP PUB NO 20190141898A1
SERIAL NO

16191063

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hydrostatic transaxle includes: a casing that is provided with an openable and closable filter insertion port and is filled with hydraulic oil; a hydraulic continuously variable transmission that is arranged inside the casing; a filter holding member that includes a support base that is a hollow cylindrical portion and oil-tightly partitions an inside of a cylinder and an outside of the cylinder, and a filter connection port that is a hollow cylindrical portion extending from a peripheral side surface of the support base and communicating with the inside of the cylinder, the support base communicating the inside of the cylinder to the port, and arranged between the center section and the casing facing the port; and a filter body that is freely inserted to and removed from the casing via the filter insertion port.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KANZAKI KOKYUKOKI MFG CO LTD2-18-1 INADERA AMAGASAKI HYOGO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iida, Masaru Amagasaki, JP 64 738
Iwaki, Koji Amagasaki, JP 69 453
Murashima, Daisuke Amagasaki, JP 14 53
Sugimoto, Hiroshi Amagasaki, JP 130 1489
Yasuda, Toshifumi Amagasaki, JP 48 238

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 10, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 10, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 10, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00