Systems and methods for pacing data flows

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11546268
APP PUB NO 20210021532A1
SERIAL NO

17061445

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method includes examining a first data packet transmitted to a first network equipment from a second network equipment. A data flow type of the first data packet is determined. If the data flow type is determined to be the first type of data flow, determining a delivery throughput of the first data packet to the first network equipment over a data flow path. The determined delivery performance of the first data packet is compared to an expected peak data throughput capacity for a data packet transmitted to the first network equipment from the second network equipment. Transmission of data packets to the first network equipment is paced if the comparison of the determined delivery performance and the expected peak data throughput capacity indicates a congestion exists over the data flow path.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OPANGA NETWORKS INC1201 THIRD AVENUE SUITE 2200 SEATTLE WA 98101-3045

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Burnette, John Seattle, US 32 393
Gibbons, David Seattle, US 48 1619
Hadorn, Ben Seattle, US 30 240
Harrang, Jeffrey Seattle, US 7 221

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 3, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 3, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 3, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00