Apparatus and method for predicting deformation temperature of coal using predictive model

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11544429
APP PUB NO 20200184132A1
SERIAL NO

16698948

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus and method predict an initial deformation temperature of coal without an additional test by using a predictive model. The apparatus includes a parameter extractor configured to analyze characteristics of test coal and to extract parameters of the test coal based on the test coal characteristic analysis; a temperature analyzer configured to analyze an initial deformation temperature (IDT) of the test coal; a modeler configured to derive an IDT predictive model for predicting the test coal IDT using the extracted parameters of the test coal and the test coal IDT; and a predictor configured to predict an initial deformation temperature (IDT) of target coal to be supplied to the coal-fired power plant by substituting parameters of the target coal into the IDT predictive model. The test coal characteristics are analyzed by ash component analysis, elementary analysis, industrial analysis, or calorific value analysis.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO LTD22 DOOSANVOLVO-RO SEONGSAN-GU CHANGWON-SI GYEONGSANGNAM-DO 51711

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Byoung Hwa Busan, KR 173 2005
Lee, Jung Min Seoul, KR 172 722

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 3, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 3, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 3, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00