Voltage control inverter, power source apparatus, energy control system, and voltage control method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11539216
APP PUB NO 20220294225A1
SERIAL NO

17469867

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to one embodiment, a voltage control inverter interconnectable with a power system, includes receiving circuitry configured to receive a first control command for outputting a voltage to the power system; and controlling circuitry configured to execute the first control command to output the voltage to the power system. The controlling circuitry is configured to skip to execute the first control command in response to the first control command being received during a period in which the power system is in a first state that is different from a normal state.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KABUSHIKI KAISHA TOSHIBAKANAGAWA KANAGAWA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kanekiyo, Yasuhiro Yokohama Kanagawa, JP 20 26
Lin, Qiang Kawasaki Kanagawa, JP 47 243
Shijo, Tetsu Tokyo, JP 58 334
Uno, Hiroshi Kawasaki Kanagawa, JP 43 618

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 27, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 27, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 27, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00