Surveying instrument

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11536567
APP PUB NO 20190078883A1
SERIAL NO

16123196

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A surveying instrument comprises a light projecting optical system for projecting a distance measuring light to a predetermined measuring point, a light receiving optical system for receiving a reflected distance measuring light and an infrared light from the measuring point, and an arithmetic control module for controlling a distance measurement and a temperature measurement based on light receiving results of the reflected distance measuring light and the infrared light, and the arithmetic control module measures a distance to the measuring point based on light receiving results of the reflected distance measuring light received by a photodetector of the light receiving optical system, and measures a temperature of the measuring point based on light receiving results of the infrared light received by a temperature sensor of the light receiving optical system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOPCON CORPORATION75-1 HASUNUMA-CHO ITABASHI-KU TOKYO 1748580

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yoshino, Ken-ichiro Tokyo-to, JP 45 449
Yuasa, Taichi Tokyo-to, JP 20 29

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 27, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 27, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 27, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00