Surveying instrument

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11536567
APP PUB NO 20190078883A1
SERIAL NO

16123196

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A surveying instrument comprises a light projecting optical system for projecting a distance measuring light to a predetermined measuring point, a light receiving optical system for receiving a reflected distance measuring light and an infrared light from the measuring point, and an arithmetic control module for controlling a distance measurement and a temperature measurement based on light receiving results of the reflected distance measuring light and the infrared light, and the arithmetic control module measures a distance to the measuring point based on light receiving results of the reflected distance measuring light received by a photodetector of the light receiving optical system, and measures a temperature of the measuring point based on light receiving results of the infrared light received by a temperature sensor of the light receiving optical system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOPCON CORPORATIONTOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yoshino, Ken-ichiro Tokyo-to, JP 45 449
Yuasa, Taichi Tokyo-to, JP 20 29

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 27, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 27, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 27, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00