Tooling assembly and associated system and method for manufacturing a porous composite structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11534992
APP PUB NO 20200282603A1
SERIAL NO

16291300

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A tooling assembly for manufacturing a porous composite structure. The tooling assembly includes a first tooling member and a second tooling member. The first tooling member includes a first body that defines a first internal volume and a first inlet. The first inlet is fluidly coupled with the first internal volume. The first tooling member also includes a first tooling surface that defines a plurality of first perforations that are fluidly coupled with the first internal volume. The second tooling member includes a second body that defines a second internal volume and a second inlet. The second inlet is fluidly coupled with the second internal volume. The second tooling member also includes a second tooling surface that defines a plurality of second perforations that are fluidly coupled with the second internal volume.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE BOEING COMPANY100 N RIVERSIDE CHICAGO IL 60606

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baker, Tara Kovacs Charleston, US 4 9
Serencsits, William L Charleston, US 11 0
Thomas, Holly J Charleston, US 5 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 27, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 27, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 27, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00