Vertical memory device including substrate control circuit and memory system including the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11532634
APP PUB NO 20190139968A1
SERIAL NO

16035995

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A nonvolatile memory device comprises a first semiconductor layer including, an upper substrate, and a memory cell array in which a plurality of word lines on the upper substrate extend in a first direction and a plurality of bit lines extend in a second direction. The nonvolatile memory device comprises a second semiconductor layer under the first semiconductor layer in a third direction perpendicular to the first and second directions, the second semiconductor layer including, a lower substrate, and a substrate control circuit on the lower substrate and configured to output a bias voltage to the upper substrate. The second semiconductor layer is divided into first through fourth regions, each of the first through fourth regions having an identical area, and the substrate control circuit overlaps at least a portion of the first through fourth regions in the third direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRONICS CO LTD129 SAMSUNG-RO YEONGTONG-GU SUWON-SI GYEONGGI-DO 16677

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lim, Bong-soon Seoul, KR 35 369
Shim, Sang-won Seoul, KR 31 301

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 20, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 20, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 20, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00