Combine harvester having a threshing device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11528847
APP PUB NO 20210185932A1
SERIAL NO

16757868

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A combine harvester is provided with: a threshing device that performs a threshing process of threshing a crop; a grain tank that stores grain obtained by the threshing process; a grain discharging device that discharges grain to be stored in the grain tank to the outside of the vehicle body; a travel driving device that drives travel of the vehicle body; and an engine that serves as a power source. The combine harvester includes a first relay shaft to which power is transmitted from an output shaft of the engine, and the power of the engine is transmitted from the first relay shaft to the grain discharging device and the travel driving device in a branched manner.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KUBOTA CORPORATION1-2-47 SHIKITSUHIGASHI NANIWA-KU OSAKA-SHI OSAKA 5568601

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hayashi, Shota Sakai, JP 30 32
Higashitaki, Ryohei Sakai, JP 3 1
Hino, Masakazu Sakai, JP 3 13
Kumatori, Tsuyoshi Sakai, JP 5 1
Nishimura, Toshinari Sakai, JP 13 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 20, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 20, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 20, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00