Method of controlling a multi-phase electrical machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11527979
APP PUB NO 20210167708A1
SERIAL NO

17107246

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of controlling a 3n-phase electrical machine (7) by means of n power converters (3a, 3b) each being controlled by a respective controller, and each power converter (3a, 3b) being configured to power a respective set of three phases of the electrical machine (7), wherein the method for each controller comprises: a) obtaining measured currents (ia,1, ib,1, ic,1, ia,2, ib,2, ic,2) of the set of three phases of the electrical machine (7) controlled by the controller, b) estimating all currents ({circumflex over (ι)}dq, 2, {circumflex over (ι)}dq, 1) of all the other sets of three phases of the electrical machine (7), which are controlled by the other controllers, c) transforming the measured currents (ia,1, ib,1, ic,1, ia,2, ib,2, ic,2) and all the estimated currents ({circumflex over (ι)}dq,2, {circumflex over (ι)}dq,1) using vector space decomposition, VSD, to obtain a set of VSD currents, and d) controlling the corresponding power converter based on the VSD currents.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ABB SCHWEIZ AGBADEN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kakosimos, Panagiotis Västerås, SE 15 2
Kanchan, Rahul Västerås, SE 10 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 13, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 13, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 13, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00