Power supply system for controlling load distribution across multiple converters for optimizing overall efficiency

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11527950
APP PUB NO 20200313539A1
SERIAL NO

16794820

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to an aspect, a power supply system includes a plurality of power converters configured to deliver a system load current to a load, where the system load current is a combination of individual load currents provided by the plurality of power converters, and a system performance controller configured to detect a value of the system load current. The system performance controller is configured to determine, using power loss information, values for the individual load currents such that a composite efficiency achieves a threshold condition. The system performance controller is configured to generate control signals to operate the plurality of power converters at the determined values.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEMICONDUCTOR COMPONENTS INDUSTRIES LLC5701 N PIMA ROAD SCOTTSDALE AS 85250

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hall, Jefferson W Chandler, US 67 638
Hari, Ajay Karthik Scottsdale, US 25 129

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 13, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 13, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 13, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00