Modeling and control of gas cycle power plant operation with variant control profile

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11525375
APP PUB NO 20210317759A1
SERIAL NO

16844476

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments of the disclosure provide a method for operating a combined cycle power plant (CCPP). The method may include creating a variant control profile for the CCPP for a power plant model of the CCPP. The method may include modifying the variant control profile in response to the variant control profile not reducing the fuel consumption or meeting the quality threshold. The method may also include adjusting the CCPP to use the variant control profile in response to the variant control profile reducing the fuel consumption and meeting the quality threshold. Using the variant control profile adjusts a turbine section inlet temperature schedule or an exhaust temperature schedule for the CCPP.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE INFRASTRUCTURE TECHNOLOGY LLC300 GARLINGTON RD GREENVILLE SC 29615

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Campbell, Anthony Bruce Simpsonville, US 3 49
Ewens, David Spencer Greer, US 23 257
Subramanyan, Karthik Johns Creek, US 4 21
Tralshawala, Nilesh Rexford, US 33 356
Wang, Difei Marietta, US 11 110

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 13, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 13, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 13, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00