Coordinating installation and connection of a motor control center subunit having moveable line contacts

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11523529
SERIAL NO

17301530

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method are provided for coordinating the installation and removal a motor control center subunit with the power connection and interruption thereof. A system of interlocks and indicators causes an operator to install a motor control center subunit into a motor control center, and connect supply and control power thereto, in a particular order. Embodiments of the invention may prevent actuation of line contacts of the bucket, and shield the line contacts, until the bucket is fully installed in the motor control center. Other embodiments also prevent circuit breaker closure until the line contacts are engaged with a bus of the motor control center.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EATON INTELLIGENT POWER LIMITED30 PEMBROKE ROAD DUBLIN D04Y0C2

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Leeman, Daniel J Fuquay-Varina, US 8 193
McPherren, Scott E Chico, US 12 226
Morris, Robert A Fayetteville, US 77 2341

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 6, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 6, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 6, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00