System and method for controlling laser projector, laser projector assembly and terminal

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11522338
SERIAL NO

16688462

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed in embodiments of the present disclosure is a system for controlling a laser projector, a laser projector assembly, a terminal, a method for controlling a laser projector, a method for controlling a laser light output, a device for controlling a laser light output and a computer readable storage medium. The system includes a first drive circuit coupled to the laser projector. The first drive circuit is configured to output an electrical signal to drive the laser projector to project laser light and to turn off the laser projector when a duration of outputting the electrical signal is greater than or equal to a preset threshold.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GUANGDONG OPPO MOBILE TELECOMMUNICATIONS CORP LTDNO 18 HAIBIN ROAD WUSHA CHANG'AN GUANGDONG DONGGUAN 523860

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bai, Jian Guangdong, CN 140 615
Chen, Biao Guangdong, CN 75 547
Guo, Ziqing Guangdong, CN 27 46
Lyu, Xiangnan Guangdong, CN 18 42
Tan, Guohui Guangdong, CN 23 60
Zhou, Haitao Guangdong, CN 81 170

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 6, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 6, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 6, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00