Terminal post assembly for termination of electrical terminals without the need for tooling

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11522303
SERIAL NO

17346346

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A terminal post assembly for connecting at least one electrical terminal to a substrate. The terminal post assembly includes a terminal post which has a substrate mounting portion, a terminal receiving portion and a cap receiving portion. The substrate mounting portion has a base and a securing portion which is dimensioned to extend through a mounting opening of the substrate. The terminal receiving portion is configured to receive the at least one electrical terminal thereon and make an electrical connection to the at least one electrical terminal. The cap receiving portion has a cap positioned thereon. the cap cooperates with the at least one electrical terminal to retain the at least one electrical terminal in position on the terminal receiving portion to maintain the electrical connection between the at least one electrical terminal and the terminal receiving portion of the terminal post of the terminal post assembly.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TE CONNECTIVITY SOLUTIONS GMBH

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Annis, Kyle Gary Hummelstown, US 36 170
Gingrich,, III Charles Raymond Mechanicsburg, US 45 725
Miller, Keith Edwin Manheim, US 57 402
Ruffini, Nicholas Paul Lancaster, US 18 67
Shimmel, Destin York, US 3 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 6, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 6, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 6, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00