Solid fuel burner and flame stabilizer for solid fuel burner

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11519600
APP PUB NO 20200363058A1
SERIAL NO

16957913

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A solid fuel burner is provided with a guide member arranged on an outer circumferential section of a distal end of a first gas nozzle so as to guide a fluid flowing through a second flow passage outward in a radial direction; and a contraction forming member that is arranged on an upstream side of the guide member with respect to the flow direction of the second flow passage so as to reduce the cross sectional area of the second flow passage. An outer diameter of the guide member is formed to be smaller than an inner diameter of an outer peripheral wall of a second gas nozzle. The first gas nozzle, the guide member, and the contraction forming member are configured so as to be integrally attachable/detachable along an axial direction of the first gas nozzle toward the outside of a furnace.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI HEAVY INDUSTRIES LTDTOKYO 100-8332

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aruga, Takeshi Yokohama, JP 5 34
Baba, Akira Yokohama, JP 77 911
Kitakaze, Kosuke Yokohama, JP 6 4
Kuramashi, Koji Yokohama, JP 45 122
Mine, Toshihiko Yokohama, JP 11 39
Mito, Shohei Yokohama, JP 4 0
Tadakuma, Satoshi Yokohama, JP 8 19

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 6, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 6, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 6, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00