Additive manufacturing technique for placing nuclear reactor fuel within fibers

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11518719
APP PUB NO 20200203028A1
SERIAL NO

16752736

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Nuclear fuel structures and methods for fabricating are disclosed herein. The nuclear fuel structure includes a plurality of fibers arranged in the structure and a multilayer fuel region within at least one fiber of the plurality of fibers. The multilayer fuel region includes an inner layer region made of a nuclear fuel material, and an outer layer region encasing the nuclear fuel material. A plurality of discrete multilayer fuel regions may be formed over a core region along the at least one fiber, the plurality of discrete multilayer fuel regions having a respective inner layer region of nuclear fuel material and a respective outer layer region encasing the nuclear fuel material. The plurality of fibers may be wrapped around an inner rod or tube structure or inside an outer tube structure of the nuclear fuel structure, providing both structural support and the nuclear fuel material of the nuclear fuel structure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FREE FORM FIBERS LLC10 CADY HILL BOULEVARD SARATOGA SPRINGS NY 12866

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Goduguchinta, Ram K Ballston Lake, US 11 77
Harrison, Shay L East Schodack, US 18 101
Pegna, Joseph Saratoga Springs, US 23 214
Schneiter, John L Cohoes, US 34 476
Vaaler, Erik G Redwood City, US 20 166
Williams, Kirk L Saratoga Springs, US 17 145

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 6, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 6, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 6, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00