Production of Lu-177 and other radionuclides via hot atom capture on nanostructured carbon

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11517633
SERIAL NO

17555839

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Described are methods for preparing radionuclides, such as radionuclides having a high specific activity. The disclosed methods include irradiating target nuclide materials, in solution, with a neutron source. The radionuclides can be separated from the target nuclide material by providing a solid carbon nanostructured material, as a suspension of solids, proximal to the target nuclide material in solution and using the recoil to drive adsorption of the radionuclide onto the solid carbon nanostructured material to transfer the radionuclides from the liquid phase (in solution) to the solid phase (adsorbed to the suspended solid carbon nanostructured material). One or more surfactants can be incorporated into the solution to facilitate formation of a stable suspension of the solid carbon nanostructured material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BOARD OF REGENTS THE UNIVERSITY OF TEXAS SYSTEM210 WEST 7TH STREET AUSTIN TX 78701

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Charlton, William S Austin, US 1 0
Lapka, Joseph Austin, US 1 0
Nolting, Donald D Austin, US 2 0
Samia, Adam J Austin, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 6, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 6, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 6, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00