Bone repair material and preparation method thereof, and biological composite scaffold

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11517610
APP PUB NO 20210128686A1
SERIAL NO

16639193

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bone repair material, a preparation method of the bone repair material, and a biological composite scaffold are provided. The bone repair material includes: a base material, and a carbon nanomaterial and a polypeptide both mixed with the base material; and the carbon nanomaterial and the polypeptide are bonded by chemical bonds. The preparation method includes: bonding a carbon nanomaterial with a polypeptide by chemical bonds; and mixing the carbon nanomaterial and the polypeptide bonded by the chemical bonds with a base material, and performing a molding treatment.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BEIJING BOE TECHNOLOGY DEVELOPMENT CO LTD100176 ROOM 407 BUILDING 1 NO 9 DIZE ROAD BEIJING ECONOMIC AND TECHNOLOGICAL DEVELOPMENT ZONE DAXING DISTRICT BEIJING BEIJING CITY BEIJING CITY 100176

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Xianzhen Beijing, CN 19 6
Li, Zhichao Beijing, CN 49 60
Liu, Changjun Beijing, CN 29 28
Zhao, Tianxiao Beijing, CN 13 9
Zhao, Tianyue Beijing, CN 45 81

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 6, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 6, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 6, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00