Woven structure and chair with the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11517110
APP PUB NO 20210330083A1
SERIAL NO

17243454

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A woven structure, which includes a woven surface, a skeleton or a wrapping strip, and a chair with the same. The woven surface has an edge and is formed by a staggered arrangement of a plurality of woven strips. One or both ends of several or all the woven strips are provided with a first protrusion, and both ends of each woven strip form edges. The skeleton or the wrapping strip can be disposed and clamped with the first protrusion on the edges of the woven surface. The chair with the woven structure comprises a chair seat and a chair surface. The chair surface includes a woven structure and is fixed on the chair seat.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ZHEJIANG ZHENDONG LEISURE PRODUCTS CO LTDNO 29 XUNDA EAST ROAD XUNQIAO TOWN LINHAI TAIZHOU ZHEJIANG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lu, Qiaojin Linhai, CN 1 0
Lu, Xiudong Linhai, CN 4 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 6, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 6, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 6, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00