Fuel cell system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11515548
APP PUB NO 20210367250A1
SERIAL NO

17216626

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fuel cell system includes a fuel cell stack, a reaction gas supply portion, and a control unit. The control unit performs two stages of purging that are a first purging and a second purging in which the flow rate of the reaction gas is smaller than the flow rate of the reaction gas of the first purging, and provides a purging standby time between the first purging and the second purging, and in a case in which an operation mode of the fuel cell stack when power generation of the fuel cell stack is stopped is a high output mode in which an output is higher than the output of a normal mode, the control unit makes a purging time longer than the purging time of the first purging that is performed in the normal mode.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujio, Koro Toyota, JP 6 1
Yamamori, Keitaro Okazaki, JP 7 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 29, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 29, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 29, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00