Projectile guide

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11512923
SERIAL NO

17384291

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A crossbow includes a frame that has a front end and a stock at a rear end. A projectile moves along a projectile axis that extends between the rear end and the front end during firing. The crossbow includes a power source that is configured to fire the projectile. The crossbow includes a latch that is movable between the rear end and the front end of the frame. The latch has a main body that defines a nock aperture aligned with the projectile axis and configured to receive a portion of the projectile therein. The crossbow includes a projectile guide connected to the main body of the latch and positioned adjacent the projectile axis. The projectile guide is configured to interface with the projectile when the projectile is in a misaligned rotational position, and be positioned between portions of the projectile when the projectile is in an aligned rotational position.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RAVIN CROSSBOWS LLC3535 TOWER AVE SUPERIOR WI 54880-5334

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Trpkovski, Paul Kailua Kona, US 94 1147

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 29, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 29, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 29, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00