Air conditioning process
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Nov 29, 2022
Grant Date -
Oct 14, 2021
app pub date -
Aug 26, 2019
filing date -
Sep 3, 2018
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A process for conditioning air, by means of a main circuit, the main circuit being a vapor compression circuit, wherein a first refrigerant circulates, and a secondary circuit with no compressor, wherein a non-flammable second refrigerant including a hydrofluoroolefin and/or a hydrochlorofluoroolefin circulates, the main circuit and the secondary circuit being coupled to one another; the process including a heat exchange between the surroundings and the first refrigerant, a heat exchange between the first and second refrigerants, and a heat exchange between the second refrigerant and the air to be conditioned. Also, an air conditioning plant for implementing the process.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
ARKEMA FRANCE | 92700 COLOMBES |
International Classification(s)

- 2019 Application Filing Year
- C09K Class
- 2848 Applications Filed
- 1793 Patents Issued To-Date
- 62.96 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Rached, Wissam | Colombes, FR | 127 | 3788 |
# of filed Patents : 127 Total Citations : 3788 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 1 Citation Count
- C09K Class
- 74.54 % this patent is cited more than
- 3 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | May 29, 2026 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | May 29, 2030 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | May 29, 2034 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events

Matter Detail

Renewals Detail
