Fan for adjusting air flow

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11512703
APP PUB NO 20210215160A1
SERIAL NO

17058608

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a fan. The fan includes a support; a first motor installed on the support, the first motor having a first rotation shaft; a first blade installed on the first rotation shaft; a second motor installed on the support, the second motor having a second rotation shaft and being coaxial with the first motor; a second blade installed on the second rotation shaft, a tilt direction of the second blade being opposite to a tilt direction of the first blade; and an electric control board electrically connected to the first motor and the second motor and configured to control a relative rotation of the first motor and the second motor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MIDEA GROUP CO LTD528311 26-28 B DISTRICT MEI HEADQUARTERS BUILDING 6 MEI ROAD BEIJIAO TOWN SHUNDE DISTRICT FOSHAN GUANGDONG FOSHAN CITY GUANGDONG PROVINCE 528311
GD MIDEA ENVIRONMENT APPLIANCES MFG CO LTD528425 DONGFENG ROAD AND DONGTING INDUSTRIAL PARK 28 DONGFENG TOWN ZHONGSHAN GUANGDONG ZHONGSHAN CITY GUANGDONG PROVINCE 528425

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cui, Shiqiang Zhongshan, CN 15 12
Fang, Yu Zhongshan, CN 128 2290
Kang, Ruixiang Zhongshan, CN 3 9
Liang, Li Zhongshan, CN 21 123
Yi, Rong Zhongshan, CN 6 18
Zhang, Huanming Zhongshan, CN 5 1
Zhang, Xusheng Zhongshan, CN 185 6873

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 29, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 29, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 29, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00