Biomass production

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11512278
APP PUB NO 20160177258A1
SERIAL NO

14971854

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process of growing a phototrophic biomass in a reaction zone, including a reaction mixture that is operative for effecting photosynthesis upon exposure to photosynthetically active light radiation, is provided. The reaction mixture includes phototrophic biomass that is operative for growth within the reaction zone. In one aspect, the carbon dioxide supply is modulated in response to detected process parameters. In another aspect, inputs to the reaction zone are modulated based on changes to the carbon dioxide supply. In another aspect, dilution of the carbon dioxide-comprising supply is effected. In another aspect, pressure of the carbon dioxide-comprising supply is increased. In another aspect, water is condensed from the carbon dioxide-comprising supply and recovered for re-use. In another aspect, the produced phototrophic biomass is harvested at a rate which approximates a predetermined growth rate of the phototrophic biomass.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • POND TECHNOLOGIES INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Di, Pietro Emidio Brampton, CA 8 17
Di, Pietro Tony Brampton, CA 9 17
Gonzalez, Jaime A Markham, CA 21 40
Kolesnik, Max Toronto, CA 21 40
Martin, Steven C Toronto, CA 25 173

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 29, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 29, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 29, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00