Electric concrete vehicle systems and methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11511642
APP PUB NO 20200316816A1
SERIAL NO

16839790

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A concrete mixer truck includes a chassis, a plurality of tractive assemblies coupled to the chassis, a mixing drum rotatably coupled to the chassis, the mixing drum defining an internal volume configured to contain material and an aperture through which the material can enter and exit the internal volume, an energy storage device positioned at a rear end of the chassis and configured to provide electrical energy, and an electromagnetic device electrically coupled to the energy storage device, where the electromagnetic device is configured to receive the electrical energy from the energy storage device and provide mechanical energy to drive at least one of the plurality of tractive assemblies to propel the concrete mixer truck.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • OSHKOSH CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bolton, Mike Oshkosh, US 31 627
Dekarske, Neil Oshkosh, US 49 720
DeVries, Loren Oshkosh, US 14 37
Hou, Yanming Oshkosh, US 39 982
Messina, Robert S Oshkosh, US 60 988
Morrow, Jon J Neenah, US 46 4980
Nasr, Nader Neenah, US 97 4560
Smith, Chad K Omro, US 50 931
Steinberger, David J Oshkosh, US 24 1110
Yakes, Chris K Oshkosh, US 9 479

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 29, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 29, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 29, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00