Balanced photonic architectures for matrix computations

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11509397
APP PUB NO 20220263582A1
SERIAL NO

17645001

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Vector and matrix multiplications can be accomplished in photonic circuitry by coherently combining light that has been optically modulated, in amplitude and/or phase, in accordance with the vector and matrix components. Disclosed are various beneficial photonic circuit layouts characterized by loss- and delay-balanced optical paths. In various embodiments, loss balancing across paths is achieved with suitable optical coupling ratios and balanced numbers of waveguide crossings (using dummy crossings where needed) across the paths. Delays are balanced in some embodiments with geometrically delay-matched optical paths.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CELESTIAL AI INCSANTA CLARA CA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bos, Martinus San Jose, US 23 104
Giamougiannis, George Salonika, GR 4 61
Lazovsky, David Los Gatos, US 16 89
Ma, Yangjin New York, US 57 391
Pleros, Nikolaos Salonika, GR 10 91
Totovic, Angelina Central Macedonia, GR 7 88
Tsakyridis, Apostolos Salonika, GR 8 88
Winterbottom, Philip San Jose, US 32 128

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 22, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 22, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 22, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00