Nitride semiconductor laminate, method for manufacturing nitride semiconductor laminate, method for manufacturing semiconductor laminate, and method for inspecting semiconductor laminate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11508629
APP PUB NO 20190148247A1
SERIAL NO

16312496

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There is provided a nitride semiconductor laminate, including: a substrate; an electron transit layer provided on the substrate and containing a group III nitride semiconductor; and an electron supply layer provided on the electron transit layer and containing a group III nitride semiconductor, wherein a surface force A of the electron supply layer acting as an attractive force for attracting a probe and a surface of the electron supply layer when measured using the probe consisting of a glass sphere with a diameter of 1 mm covered with Cr, is stronger than a surface force B of Pt when measured under the same condition, and an absolute value |A−B| of a difference between them is 30 μN or more.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMITOMO CHEMICAL COMPANY LIMITED2-7-1 NIHONBASHI CHUO-KU TOKYO 1036020 ?1036020

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Horikiri, Fumimasa Ibaraki, JP 64 150

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 22, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 22, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 22, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00