Elevated roadway quasi-equilibrium support system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11505900
APP PUB NO 20210238809A1
SERIAL NO

17162557

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Structures and methods for controlling road temperature over an underpass space are disclosed, including a structure comprising: footings underlying the road supporting a support assembly comprising: an inner shell; a plurality of beams surmounting the inner shell; an insulating material for thermally isolating the road and the remainder of the support assembly from the underpass space; an outer shell; a temperature control assembly; temperature sensors disposed in the road and the support assembly; and a computer processor configured to receive temperature and weather forecast data; predict changes to the temperature of the support assembly and the road based on the temperature and forecast data; and control the application or removal of heat to the support assembly, based on the predicted changes to the temperature of the support assembly and the road, resulting in the road maintaining a temperature within a predetermined range.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TERACELLS INC1700 OLDE TOWNE RD EDMOND OK 73034

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Thomas,, Sr Rupert R Edmond, US 4 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 22, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 22, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 22, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00