Rail transportation system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11505222
APP PUB NO 20220281495A1
SERIAL NO

17704837

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A rail system includes a main track, a spur track connected to the main track by a switch changeable between a closed state and an open state, and a station spaced from the main track and accessible by the spur track. The rail system further includes a train with a passenger car and an EMDI releasably coupleable behind the passenger car. A method of operating the rail system includes decoupling the EMDI from the passenger car when the train is moving at a first speed toward the switch in the closed state. The EMDI is decelerated to a second speed less than the first speed. After the train has moved past the switch and the switch has been changed to the open state, the EMDI is diverted from the main track to the spur track via the switch in the open state and decelerated to a stop at the station.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AMERICAN SOLAR RAIL LLCMARIETTA GA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Green, Robert Escoe Macon, US 3 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 22, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 22, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 22, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00