Power supply unit for aerosol generation device with switch unit on data line

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11503862
SERIAL NO

17464724

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power supply unit for an aerosol generation device includes an internal power supply configured to hold power supplied to a heater configured to heat an aerosol source, a first connector connectable to an external device and including a first communication terminal, a controller configured to control power supply from the internal power supply to the heater and including a second communication terminal, a first communication path between the first communication terminal of the first connector and the second communication terminal of the controller, and a switch unit positioned on the first communication path and configured to set the first communication path to a conductive state or a disconnected state.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JAPAN TOBACCO INC2-1 TORANOMON 2-CHOME MINATO-KU TOKYO 105-8422

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aradachi, Takao Tokyo, JP 56 1493

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 22, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 22, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 22, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00