Device for producing processed cheese portions

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11503796
APP PUB NO 20190261592A1
SERIAL NO

16411874

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a device for producing processed cheese portions, comprising a plurality of modules that are arranged successively in the direction of production, in which the processed cheese is formed into a band, cooled, and divided into portions, wherein the modules define a production space through which the processed cheese travels during the production of the processed cheese portions. The production space is enclosed by a spray-proof casing, wherein the casing comprises a frame structure and a plurality of sheet metal elements which are detachably connected to the frame structure, and wherein a sealing hose is arranged between a sheet metal element and the area of the frame structure opposite thereto, and encircles the sheet metal element or the area of the frame structure opposite thereto.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HOCHLAND SE

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bechteler, Richard Heimenkirch, DE 3 0
Biggel, Andreas Hergatz, DE 17 50
Burger, Josef Leutkirch-Reichenhofen, DE 16 41
Handerer, Thomas Heimenkirch, DE 3 0
Schmidt, Sebastian Lindau, DE 246 1475

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 22, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 22, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 22, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00