Armrest handlebar and bicycle handlebar assembly having the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11498637
APP PUB NO 20210237825A1
SERIAL NO

16780454

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An armrest handlebar and a bicycle handlebar assembly having the armrest handlebar are disclosed. The bicycle handlebar assembly includes a steering handlebar, the armrest handlebar, and two armrest pads. The steering handlebar is pivotally engaged with a frame. The armrest handlebar includes two extending tubes which are engaged with the steering handlebar. Each of the extending tubes includes a combining segment, a lifting segment, a leaned segment, and a holding segment which are sequentially disposed. The lifting segment is raised above the combining segment at a first angle, and the leaned segment is raised above the combining segment at a second angle. A curved surface is formed by recessing from a top surface of each of the leaned segments. Each of the two armrest pads is engaged with the steering handlebar and has a concave surface for a rider to lean on.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TIEN HSIN INDUSTRIES CO LTDNO 6 WUGONG 8TH RD WUFENG DIST TAICHUNG CITY 41353

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gu, Fong-Syuan Taichung, TW 7 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 15, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 15, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 15, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00