Method for producing a multilayer film

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11498323
APP PUB NO 20190143662A1
SERIAL NO

16300316

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a multilayer film including at least two layers joined by a two-component adhesive includes the following steps: spreading a first component A of a two-component adhesive on a first face of a first layer of film; spreading a second component B of the two-component adhesive on a first face of a second layer of film; bringing the first and second faces of the first and second layers into mutual contact joining the components and to form an adhesive and join the two layers in a multilayer film; and winding the multilayer film obtained.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NORDMECCANICA S P A29100 PIACENZA (PC)

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cerciello, Vincenzo Piacenza, IT 3 0
Farina, Stefano Piacenza, IT 5 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 15, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 15, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 15, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00