Method for producing a component, in particular vehicle component, and correspondingly produced component

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11498126
APP PUB NO 20190262904A1
SERIAL NO

16282636

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The disclosure relates to a method for producing a component, in particular a vehicle component or an engine component, such as a piston of an internal combustion engine. The method comprises forming a first body region, in particular by means of casting or forging. The method includes forming a second body region, which is connected to the first body region, from an aluminium alloy or an iron-based alloy or a copper-based alloy by means of an additive manufacturing method. The second body region is alloyed in such a manner that it has higher thermal stability, higher mechanical strength or higher wear resistance upon tribological stressing than the first body region.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MAN TRUCK & BUS AG80995 MÜNCHEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Korn, Matthias Erlangen, DE 3 0
Scharf, Peter Nuremberg, DE 9 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 15, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 15, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 15, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00