Containerized system for mixing dry additives with bulk material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11498037
APP PUB NO 20190111401A1
SERIAL NO

16089745

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In accordance with presently disclosed embodiments, systems and methods for efficiently handling dry additives to be mixed with bulk material in a blender are provided. The systems may include a support structure used to direct bulk material from one or more portable containers on the support structure to a first outlet location, and a combined metering/transferring system for directing dry additives from another portable container to a second outlet location. Specifically, the metering/transferring system may output a metered flow of dry additives to the blender mixer to be combined with bulk material that is released from the portable containers. The metering/transferring system may utilize a gravity feed outlet coupled to a metered screw or other conveying device to move the dry additive from the portable container to the second outlet location.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HALLIBURTON ENERGY SERVICES INC3000 N SAM HOUSTON PARKWAY E HOUSTON TX 77032-3219

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lucas, Bryan Chapman Duncan, US 45 461
Schaffner, Austin Carl Duncan, US 40 351
Stegemoeller, Calvin L Duncan, US 66 2106
Warren, Wesley John Marlow, US 50 476

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 15, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 15, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 15, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00