System and method for manufacturing positive electrode for secondary battery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11495781
APP PUB NO 20220045309A1
SERIAL NO

17145600

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for manufacturing a positive electrode for a secondary battery includes an unwinder wound with a positive electrode base material, a first coating unit for coating an insulating material at predetermined positions about widthwise edges of the base material with respect to a transfer direction of the base material supplied from the unwinder, a first drying furnace for drying the insulating material by heating the base material coated with the insulating material, a second coating unit for coating a positive electrode slurry on the base material supplied from the first drying furnace in a region between the insulating material formed at both sides of the base material, and a second drying furnace for heating and drying the base material coated with the insulating material and the positive electrode slurry.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KIA CORPORATION12 HEOLLEUNG-RO SEOCHO-GU SEOUL 06797

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cho, Hyoup Je Suwon-si, KR 4 5
Jeong, Sung Hoon Seoul, KR 17 29
Min, SeungJun Bucheon-si, KR 5 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 8, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 8, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 8, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00