Oven with renewable energy capacities

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11493275
APP PUB NO 20190107330A1
SERIAL NO

15922605

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Techniques for utilizing excess heat generated by an oven to generate electricity are provided. In one example, an oven can comprise a coolant pathway positioned adjacent to a hollow space within the oven, wherein the hollow space can contain heat. The oven can also comprise a chamber in fluid communication with the coolant pathway. The oven can further comprise a turbine in fluid communication with the chamber and an outlet. Moreover, the oven can comprise a generator connected to the turbine, wherein rotation of the turbine can power the generator.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TPS INTERNATIONAL LLC25101 CHAGRIN BOULEVARD SUITE 350 CLEVELAND OH 44122

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dingman, Lyle Oscar East Troy, US 15 10
Grande, Michael Laddie Elkhorn, US 15 10
Gromiuk, Geoffry Allen Mukwonago, US 15 10
Hanson, Gary Allen Janesville, US 15 10
Kempowski, Steven Edward Oconomowoc, US 15 10
Ludlum, Jon Allen Darien, US 15 10
Schneck, Michael Abraham New Berlin, US 15 10
Strand, David Allen Burlington, US 15 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 8, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 8, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 8, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00