Processes for the conversion of mixed oxygenates feedstocks to hydrocarbon fuels

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11492303
SERIAL NO

17318204

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for forming a desired hydrocarbon fuel product from a mixed oxygenate feedstock by utilizing chemical processes to form ketones from the oxygenate feed, upgrade the ketones, recycle selected upgraded ketones through the upgrading process to obtain a desired intermediate and hydrogenating the desired intermediate to obtain the desired hydrocarbon fuel product. In various alternative configurations and embodiments this can be accomplished in a number of ways, and originate in a number of different positions and occasions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BATTELLE MEMORIAL INSTITUTE902 BATTELLE BOULEVARD RICHLAND WA 99354

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brady, Casper O Richland, US 4 0
Guo, Mond F Richland, US 6 3
Kallupalayam, Ramasamy Karthikeyan West Richland, US 2 0
Sanyal, Udishnu Richland, US 4 0
Subramaniam, Senthil Richland, US 4 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 8, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 8, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 8, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00