Method of intelligently managing pressure within an evacuated transportation system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11492020
APP PUB NO 20210347391A1
SERIAL NO

16867049

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A high-speed transportation system comprises an evacuated travel conduit divided into a plurality of segments by closable gates, and associated with corresponding segment pumps that maintain operating vacuums within the segments when vehicles are present. When a segment is unoccupied, energy is saved by closing the adjoining gates and deactivating the associated segment pump, thereby deactivating the segment and allowing the segment's internal pressure to rise due to leakage. As a vehicle approaches, the segment pump is reactivated, lowering the internal pressure to the operating vacuum, and the gates are opened. Embodiments include a boom-tank system that can accelerate re-evacuation of a segment having an increased internal pressure by establishing fluid communication with at least one recently deactivated segment having a lower internal pressure. As a vehicle transits the conduit, a rolling, contiguous group of activated segments surrounding and in advance of the vehicle can be maintained.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FLOWSERVE PTE LTDSINGAPORE 637345

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hawkins, Paul Matthew Dallas, US 1 1
Mancuso, Michael Albert Coppell, US 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 8, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 8, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 8, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00