Separator film conveyance device for nonaqueous electrolytic-solution secondary battery and method for manufacturing separator film for nonaqueous electrolytic-solution secondary battery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11491494
APP PUB NO 20210184310A1
SERIAL NO

16760027

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A nonaqueous electrolyte secondary battery separator film transfer device is provided which realizes a foreign object removing technique that is less likely to cause defects in a separator. The device includes a magnet bar which is arranged in a transfer path and generates a magnetic field for removing, from a separator film being transferred, a magnetic substance adhering to a first surface of the separator film; and an air cylinder which allows a distance to the magnet bar from the first surface of the separator film to be variable.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMITOMO CHEMICAL COMPANY LIMITED2-7-1 NIHONBASHI CHUO-KU TOKYO 103-6020

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Egawa, Takamasa Osaka, JP 9 5
Kataoka, Tatsuya Niihama, JP 61 922
Kon, Yusuke Niihama, JP 13 14
Sakamoto, Akinobu Niihama, JP 13 44
Sakuma, Wataru Niihama, JP 23 584
Tsukuda, Yosuke Niihama, JP 5 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 8, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 8, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 8, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00