System and method for determining hydrogen supply failure of fuel cell

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11489180
SERIAL NO

16828467

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a system for determining a hydrogen supply failure of a fuel cell, the system including: a fuel cell, a plurality of hydrogen tanks having hydrogen, a hydrogen supply line connected to the hydrogen tanks and supplying hydrogen from the hydrogen tanks to the fuel cell, a plurality of tank valves mounted on the hydrogen tanks, respectively, and discharging hydrogen in the hydrogen tanks to the hydrogen supply line when opening, a pressure sensor sensing pressure in the hydrogen supply line, and a determiner determining poor opening of the hydrogen tanks on the basis of pressure information sensed by the pressure sensor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KIA MOTORS CORPORATION12 HEOLLEUNG-RO SEOCHO-GU SEOUL 06797
HYUNDAI MOTOR COMPANY12 HEOLLEUNG-RO SEOCHO-GU SEOUL 06797 06797

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kwon, Soon Woo Yongin-si, KR 56 160
Lee, Dong Hun Anyang-si, KR 300 1649
Min, Boung Ho Yongin-si, KR 13 18

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 1, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 1, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 1, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00