DIN rail shield

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11482815
APP PUB NO 20210184406A1
SERIAL NO

17189894

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A shield device includes: a first electrical conductor; an electrical insulator that is configured to electrically insulate the first electrical conductor from a second electrical conductor; a first shield connector configured to: directly contact at least 180 degrees of a first circumference of a first shield that surrounds at least two first insulated conductors of a first section of a shielded cable; and electrically connect the first shield with the first electrical conductor; and a second shield connector configured to: directly contact at least 180 degrees of a second circumference of a second shield that surrounds at least two second insulated conductors of a second section of the shielded cable; and electrically connect the second shield with the first electrical conductor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BAKC CAPITAL GROUPSUWANEE GA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Karjala, Bruce Suwanee, US 4 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 25, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 25, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 25, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00