Ignition coil

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11482367
APP PUB NO 20190214177A1
SERIAL NO

16328485

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An ignition coil, including: a center core; a primary coil wound around the center core; a secondary coil wound around the primary coil; a side core, which is arranged around the secondary coil, and is coupled to the center core to from a closed magnetic path; a case configured to accommodate the center core, the primary coil, the secondary coil, and the side core; and an insulating resin filled in the case, wherein the side core includes a wide portion having a larger width in a direction from the center core to the side core, and a narrow portion having a smaller width than the wide portion, and wherein the narrow portion is formed on a high-voltage side of the side core.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATION2-2-3 MARUNOUCHI CHYODA-KU TOKYO 100-8310

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Idogawa, Takashi Tokyo, JP 19 74

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 25, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 25, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 25, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00